[1]
“IMPLIMENTAION OF AN FSM - CONTROLLD AHB TO APB BRIDGE”, int. J. Eng. Res. Sci. Tech., vol. 22, no. 2(1), pp. 2001–2005, Apr. 2026, doi: 10.62643/ijerst.2026.v22.n2(1).pp2001-2005.